PA TURNPIKE MILEPOST 298 to 312 TOTAL RECONSTRUCTION PROJECT

PROJECT DETAILS

The project has been divided into three sections for design due to the length of the project: MP 298 - 302, MP 302 - 308, MP 308 - 312

Project Summary:
Mainline, Total Reconstruction and Widening Project, MP 298 - 312

Engineering Design:
Summer 2013

Open House Plans Displays:
Milepost 298 - 302 - November 17, 2015
Milepost 302 - 308 - To be determined
Milepost 308 - 312 - September 24, 2015

Mainline Construction:
To be determined: At this early stage, these time frames are approximate and will be refined as the project advances.