PA TURNPIKE MILEPOST 298 to 312 TOTAL RECONSTRUCTION PROJECT

PROJECT DETAILS (302 - 308)

Preliminary Design began in 2013 on the future reconstruction and widening of the Mainline of the Pennsylvania Turnpike (I-76) from Milepost 302 to Milepost 308 in Chester County.

Project Summary:
Mainline, Total Reconstruction and Widening Project, MP 302 - 308

Engineering Design:
Summer 2013

Open House Plans Display:
To be determined

Mainline Construction:
View the Schedule. *These time frames are approximate and will be refined as the project advances.

Bridge Replacements:
SR 0345 Bulltown Road
View the Project Presentation board-draft.
T-45 Adams Drive