PA TURNPIKE MILEPOST 298 to 312 TOTAL RECONSTRUCTION PROJECT

PROJECT DETAILS (308 - 312)

Preliminary Design began in 2013 on the future reconstruction and widening of the Mainline of the Pennsylvania Turnpike (I-76) from Milepost 308 to Milepost 312 (SR 100) in Chester County.

Project Summary:
Mainline, Total Reconstruction and Widening Project, MP 308 - 312

Engineering Design:
Summer 2013

Open House Plans Display:
September 24, 2015 - View the Open House Materials.

Mainline Construction:
View the Schedule. *These time frames are approximate and will be refined as the project advances.