Total Reconstruction and Widening of MP 40 to 48
Photo Album

Below you will find pictures of the actual construction progress. Click the image to view a larger version.

The photo album will be updated with construction photos as they are available.

June 2018 Construction Photos


Single Face Conrete Barrier STA 600+50 to 603+00 EB RT


Sheet Pile Wall Backfille


Sheet Pile Wall Upper Drainage Layer Stone and Impervious Membrane


Pavement Base Drain EB RT


May 2018 Construction Photos


Subbase Placement-EB STA 572+00 to 586+00


WB Cut Slope STA 735+00 to 749+00 View Saxonburg Boulevard Bridge


WB View From Gibsonia RD Bridge MP 42.55


Sheet Pile Wall Backfill


April 2018 Construction Photos


Construction of Basin 554


Eastbound Rock Drains


Grading East Bardonner Road


WB Cust Slope Sta 735+00 to 749+00


March 2018 Construction Photos


Rock Fill - 771+00 to 777+00 WB


Sheet Pile Wall - Driving Mini Fins


Sound Barrier Wall - Setting Precast Panels


WB Cust Slope Sta 735+00 to 749+00


February 2018 Construction Photos


MP 39.21 WB Sound Barrier Panel Placement


Sheet Pile Wall Radius - Rear View


MP 40.7 Looking Eastbound


MP 42.0 Looking Eastbound


January 2018 Construction Photos


WB-421 Repaired Beams


MP 39.21 WB Sound Barrier Panel Placement


MP 42.9 WB Cut Slope


Geofoam Installation Over Existing WB-421


December 2017 Construction Photos


Looking East from Middle Road Bridge


MP 40.6 Rock Excavation Eastbound


Sound Barrier Wall Posts


Westbound Access Road


November 2017 Construction Photos


Driving Sheet Pile Wall


WB-421 Concrete Beam Erection


WB-421 Concrete Deck Placement


WB Access Road Pavement and Guiderail


October 2017 Construction Photos


MP 40.84 Sheet Pile


WB-421 Tying Rebar Abutment 2 Wall


WB-422 Arch-Culvert Pouring


WB-422 Formimg Arch Culvert


September 2017 Construction Photos


MP 39.35 - WB-421 Abutment 2 Footing Forming


MP 39.4 - WB-422 Arch Culvert Extension


MP 39.4 WB-422 Arch Forming and Rebar


MP 43.0 - WB-428 WB Inlet Wingwall


August 2017 Construction Photos


MP 39.37 - WB-421 Foundation Construction - East Bardonner Road


MP 39.89 - WB-422A Westbound Arch Culvert Concrete Placement


MP 41.10 - Eastbound Widening Excavation


MP 41.50 - Westbound Widening Excavation


July 2017 Construction Photos


MP 39.37 - WB-421 Bridge Extension - Abutment 1 Temporary Shoring


MP 41.30 - Eastbound Cut Slope - Preparation For Excavation


MP 42.06 - WB-426 Eastbound Box Culvert Extension - Rebar Placement


MP 43.00 - WB-428 Westbound Box Culvert Extension - Forming


June 2017 Construction Photos


MP 39.37 - WB-421 Temporary Shoring Installation East Bardonner Road


MP 39.89 - WB-422A Westbound Arch Culvert Extension Forming


MP 41.58 - WB-425 Westbound Box Culvert Extension Roof Placement


MP 42.06 - WB-426 Westbound Box Culvert Extension Concrete Apron Placement


May 2017 Construction Photos


MP 39.89 - WB-422A Westbound Arch Culvert Extension Temporary Shoring Installation


MP 39.90 PTC Gibsonia Maintenance Westbound Access Road Construction


MP 41.58 - WB-425 Westbound Box Culvert Extension Construction


MP 42.06 - WB-426 Westbound Box Culvert Extension Construction


April 2017 Construction Photos


MP 40.10 Mainline Pavement Mill and Overlay


MP 40.20 Eastbound Pavement Rehabilitation


MP 40.30 Mainline Pavement Mill and Overlay


MP 39.70 Westbound Pavement Rehabilitation Complete


March 2017 Construction Photos


MP 39.37 East Bardonner Road Existing Structure


MP 39.37 East Bardonner Road Gas Line Relocation


MP 41.90 Tree Clearing Completed in March 2017


MP 42.80 Tree Clearing Completed in March 2017


February 2017 Construction Photos


MP 41.6 - Tree Clearing In Preparation For Widening and Reconstruction Project


MP 42.3 - Tree Clearing In Preparation For Widening and Reconstruction Project


MP 42.3 - Tree Clearing In Preparation For Widening and Reconstruction Project


MP 42.4 - Tree Clearing In Preparation For Widening and Reconstruction Project


January 2017 Construction Photos


MP 41.1 - Tree Clearing In Preparation For Widening and Reconstruction Project


MP 41.3 - Tree Clearing In Preparation For Widening and Reconstruction Project


MP 42.3 - Tree Clearing In Preparation For Widening and Reconstruction Project


MP 42.5 - Tree Clearing In Preparation For Widening and Reconstruction Project


December 2016 Construction Photos


MP 39.2 to MP 43.6 - Tree Clearing - Felling Equipment


MP 39.2 to MP 43.6 - Tree Clearing In Preparation For Widening and Reconstruction Project


MP 39.2 to MP 43.6 - Tree Clearing In Preparation For Widening and Reconstruction Project


MP 39.2 to MP 43.6 - Tree Clearing In Preparation For Widening and Reconstruction Project


November 2016 Construction Photos


MP 43.59 WB-430 - SR0910 Open - Construction Complete


MP 45.40 Six Travel Lanes Open - Construction Complete


MP 45.50 Six Travel Lanes Open - Construction Complete


MP 46.50 Six Travel Lanes Open - Construction Complete


October 2016 Construction Photos


MP 44.32 Completed Roadway Looking East - Right Shoulder Closure For Punch List Work


MP 44.32 Completed Roadway Looking West - Right Shoulder Closure For Punch List Work


MP 45.20 Completed Eastbound Three Lanes Opened - Right Shoulder Closure For Punch List Work


MP 46.31 Completed Roadway - Right Shoulder Closure For Punch List Work


September 2016 Construction Photos


MP 46.10 WB-440, P 46.21EB, and WB-439


MP 46.31 Six Lane Widening and Reconstruction Complete


MP 44.32, SN44.11EB, and Reconstruction Limit


MP 45.53, SN45.54WB, and DMS


August 2016 Construction Photos


MP 43.59 WB-430 Concrete Bridge Deck Complete - SR0910 Paving


MP 45.00 Final Wearing Course Paving


MP 46.18 WB-439 Mainline I-76 Over Deer Creek - Steel Girder Painting Complete


MP 46.89 WB-441 Mainline I-76 Bridge Complete


July 2016 Construction Photos


MP 45.80 Asphalt Base Course Placed


MP 45.45 Pavement Base Drain Installation


MP 45.52 Roadway Reconstruction Paving Operation


WB-430 SR0910 Bridge MP 43.59 Concrete Deck Placement


June 2016 Construction Photos

MP 44.35 Asphalt Binder Course Placed


MP 46.30 Roadway Reconstruction

MP 46.40 Roadway Reconstruction


WB-430 SR0910 Bridge MP 43.59 Preparation for Concrete Deck Placement


May 2016 Construction Photos

MP44.11 Roadway Reconstruction


WB-439 MP46.18 Concrete Deck Placed

WB-430 SR0910 Bridge MP43.59 Concrete Beam Erection


WB-430 SR0910 Bridge MP43.59 Concrete Beams Installed


April 2016 Construction Photos

MP44.11 Hot Mix Asphalt Paving


WB-439 MP46.18 Steel Girder Installation

WB-430 MP43.59 Median Pier Construction


WB-441 MP46.89 Intermediate Diaphragm Concrete Placement


March 2016 Construction Photos


MP 44.40 Existing Roadway Concrete Broken to be Recycled


MP 44.50 Median Drainage Installation


MP 45.54 WB Rock Fall Fence


MP 46.18 WB-439 Abutment 1 Stem Form


February 2016 Construction Photos


WB-430 MP43.59 Demo and Abutment 1 Progress


WB-439 MP 46.18 Pier Cap Placement


WB-439 MP 46.18 Stage 3 Abutment 1 Demolition


WB-441 MP 46.89 Stage 3 Abutment 1 and 2 Construction


January 2016 Construction Photos


SR 1013 PennDOT Maintenance Facility Access Gate


WB-439 MP 46.18 Excavation at Abutment 2


WB-439 MP 46.18 Installing Rebar for Pier Stem


WB-441 MP 46.89 Abutment 2 Stem Placement


December 2015 Construction Photos


Completed Soil Nail Wall SN44.11EB


WB-429 MP 43.13


WB-433 MP44.32 Existing Roadway Milling


WB-440 MP 46.33 Existing Roadway Milling


November 2015 Construction Photos


WB Paving MP 45-50


Completed Soil Nail Wall SN45.54WB


WB-429 over Mainline Facing South


Peluso Wetland Site


October 2015 Construction Photos


Mainline East East Deer Creek Stream Mitigation view from SR 1013


Deck Rebar WB-429 Span 1


Mainline East SN 45-54 WB Sculpted Shotcrete Facing West


Mainline East Basin 805


September 2015 Construction Photos


PP46.21 EB - MP 46.21


WB-429 - MP 43.13


WB-433 - SN44.11 WB - MP 44.20


WB-441 - MP 46.90


August 2015 Construction Photos


Aestetic Shotcrete Application SN 44.11 EB - Milepost 44.11


Deer Creek Stream Mitigation


Embankment Construction Milepost 44.10 EB


WB-429 Construction Milepost 43.13


July 2015 Construction Photos


Milepost 46.05 Girder Removal


Saxonburg Boulevard Bridge North Abutment Concrete Placement


Saxonburg Boulevard Bridge South Pier and Abutment Construction


Soil Nail Wall at Milepost 45.54 Westbound


June 2015 Construction Photos


Milepost 44.1 Outlet Backfilled


Milepost 44.7 Outlet Headwall Form Installation


Milepost 46.9 Abutment 1 Westbound


Saxonburg Plan X Pick 3 Girder Lift


May 2015 Construction Photos


Mainline Excavation at Milepost 46.8 looking West


Saxonburg Blvd Bridge Deck Demolition at Milepost 43.1


Saxonburg Blvd Bridge Excavation South of Mainline Turnpike


Soil Nail Wall at Milepost 44.2 Eastbound


April 2015 Construction Photos


Bridge WB-439 West Abutment at Milepost 46.2 Eastbound


Bridge WB-441 West Abutment at Milepost 46.9 Eastbound


Culvert WB-437 Extension at Milepost 45.4 Eastbound


WB-434 Arch Culvert Extension at Milepost 44.4 Eastbound


March 2015 Construction Photos


WB-431 Culvert Extension Westbound MP 44.1


WB-434 Arch extension Westbound at MP 44.4


WB-437 Culvert Extension Eastbound MP 45.4


WB-441 Bridge Pile Driving Eastbound at MP 46.9


February 2015 Construction Photos


WB-434 Arch culvert extension formwork at Milepost 44.4 westbound


WB-437 Wingwall B Temporary Shoring at Milepost 45.4


WB-441 Westbound Abutment 2 Dynamic Pile Testing at Milepost 46.9


Excavation at Milepost 45 Eastbound


January 2015 Construction Photos


WB-434 Arch culvert extension worksite at Milepost 44.4 westbound


Eastbound Embankment Milepost 44.86 facing west


Wall RE 45.83 Eastbound Temporary Shoring Shotcrete at Milepost 45.85


Westbound Roadway Paving at Milepost 46.8


December 2014 Construction Photos


910 West Bridge open to traffic


Rock Embankment at Milepost 46.5 Eastbound


Soil Nail Wall 44.11 at Milepost 44.2 Eastbound


Temporary Shoring at upstream end of WB-434 Arch Culvert


November 2014 Construction Photos


910 West Bridge nearing completion


Excavation for Stormwater Basin 874


WB-434A upstream box culvert extension


Westbound Cut Slope at Milepost 46


October 2014 Construction Photos


910 West Bridge Deck Concrete Placement


910 West Bridge Deck Forming


910 West Bridge Steel Erection


WB-434A Culvert Extension


September 2014 Construction Photos



910 West Bridge median pier formwork and reinforcement


Eastbound Class I Excavation West of SR 0910


Mainline East Type B Rock Stockpile


910 West Bridge progress facing south


August 2014 Construction Photos


910 West Bridge facing westbound


910 West Bridge south abutment architectural treatment


910 West Bridge south abutment backfill


Fabricated Girders


July 2014 Construction Photos


910 West Bridge north abutment formwork


910 West Bridge north abutment progress


910 West Bridge progress looking south across turnpike


910 West Bridge westbound cut and pier 1


June 2014 Construction Photos


Fabricated Girders


View from Abutment 1 facing south across turnpike


View from Abutment 2 facing north across turnpike


View of mainline facing west from abutment 1


May 2014 Construction Photos


910 West Bridge Pier 1 Pile Placement


910 West Bridge Pier 3 Cap Placement


910 West Bridge Westbound Cut Progress


Rich Hill Road Bridge Completed


April 2014 Construction Photos


910 West Bridge looking South across Turnpike


Removal of 910 West Bridge Girder G1


Removal of 910 West Bridge Girder G2


Rich Hill Bridge Deck Placement


March 2014 Construction Photos


910 West Bridge excavation on slope North of Turnpike


910 West Bridge jobsite looking South across Turnpike


910 West Bridge Pier 3 Reinforcing Steel


Rich Hill Road Bridge facing North across the Turnpike


February 2014 Construction Photos


910 West Bridge excavation north of bridge


910 West Bridge deck demolition


Rich Hill Road Bridge girder erection


Rich Hill Road Bridge west half girders placed


January 2014 Construction Photos


Pile placement at 910 west, Pier 3


Rock embankment at 910 west


Rich Hill Road Bridge view across turnpike facing north


Rich Hill Road Bridge view across turnpike facing south


November 2013 Construction Photos


910 East Bridge


Completed Middle Road Bridge


Rich Hill Road Bridge West Portion Demolition


Rich Hill Road Bridge West Portion Demolition


October 2013 Construction Photos


910 East Bridge opened to traffic


910 East Bridge


Deck Reinforcement for eastern half of the Rich Hill Road Bridge


Excavation of slope North of the Turnpike at the 910 West Bridge


September 2013 Construction Photos


910 East Bridge Structural Steel Erection


910 West Bridge deep mine grouting completed at south abutment


Middle Road Bridge deck concrete placement


Rich Hill Road Bridge Structural Steel Erection


August 2013 Construction Photos


910 East Bridge view south across Mainline


Exploratory Drilling


Middle Road bridge metal decking


Middle Road paving


July 2013 Construction Photos

Rich Hill Road Pier Stem Concrete Placed


Middle Road Beam Erection


Middle Road Beam Erection


910 East Pier Cap Concrete Placement


June 2013 Construction Photos

Middle Road Abutment 2


910 East Bridge view south across Mainline


Rich Hill Road Abutment 1 Shoring


Rich Hill Road Pier Stem Forms


May 2013 Construction Photos

910 East Bridge Abutment 2 Piling


910 East Bridge view across Mainline Pier 1


Middle Road Bridge Abutment 2 Footer Rebar


Rich Hill Road Bridge Partial Demolition


April 2013 Construction Photos

910 East Bridge View across Main Line


910 East South Abutment Pile Driving


Middle Road Bridge Beam Removal


Middle Road North Abutment Demolition

March 2013 Construction Photos


WB 433 Demolition


WB 433 Abutment 1


WB 423 Demolition


Route 910 East Bridge