Stage 3 Construction: PLANNED

Late 2019 to Late 2020

Project Details

  • Shift two lanes of northbound and two lanes of southbound traffic to the newly reconstructed northbound and southbound lane and shoulder
  • Remove existing northbound and southbound travel lanes
  • Install remaining stormwater drainage pipes and inlets
  • Complete construction of drainage basins
  • Complete sound barrier construction
  • Reconstruct the existing two northbound and southbound travel lanes
  • Replace middle section of bridges over Schoolhouse Road, Creamery Road, Dietz Mill Road and Perkiomen Creek

Travel Impacts

  • Maintain two lanes in each directions on Turnpike during peak travel times
  • Periodic single Turnpike lane closures in either or both directions during off-peak travel times
  • Flagger-controlled restrictions on local roads at bridge construction areas during off-peak travel times
  • Periodic local road closures/detours at bridge construction areas

 