Southern Beltway Projects

header
Map
Contact Details

back

ABOUT THE PROJECT

U.S. Route 22 to Quicksilver Road to Panhandle Trail Section 55A2 located between sections 55A1 and 55B in Washington County is approximately 2.7 miles in length and includes:

  • Four precast concrete box culverts
  • One single-span precast concrete arch bridge
  • One single-span composite prestressed concrete PA bulb-tee beam bridge
  • Dual single-span composite steel multi-girder bridges
  • Dual eight-span composite steel multi-girder bridges
  • One full interchange
  • Reconstruction of State Route 980, State Route 4037 (Fort Cherry Road), and State Route 4012 (Noblestown Road)
The project requires more than three million cubic yards of excavation and includes a new connector road that will link Fort Cherry and Noblestown roads to State Route 980.

Schedule Photos


Back
to
Top